Gemini II (space mission in Project Gemini)
January 19, 1965
No crew
18 min, 16 seconds

Demonstrated reentry heat protection during maximum heating reentry; demonstrated structural integrity of spacecraft; demonstrated satisfactory performance of major subsystems; demonstrated checkout and launch procedures; evaluated backup guidance steering signals through launch.

Source: NASA

Log in or register to write something here or to contact authors.